Renovating a Home in Dubai: Who Approves What for Tenants and Owners

What Dubai tenants and owners may change under Law No. 26 of 2007 and Law No. 6 of 2019: landlord consent, licences, common parts and facades, handing back the property, deposits, and how to plan works.

Published 2026-11-14 · Power Zone

Why renovation permissions matter in Dubai

Renovating a flat, townhouse or villa in Dubai is rarely just a question of budget and taste. Before the first tile is lifted, the person paying for the work needs to know who owns which part of the property, whose permission is needed, which works need licences from the competent authorities, and what happens to the improvements when a lease ends. Getting these questions wrong can mean stopped works, disputes with neighbours or building management, or a deposit dispute at move-out.

Two Dubai laws answer most of these questions. Law No. (26) of 2007 regulating the relationship between landlords and tenants sets out what a tenant may change, what a landlord must provide, and how the property must be handed back. Law No. (6) of 2019 concerning jointly owned real property sets out what belongs to each unit in a tower or community, what counts as common parts, and what may not be altered without approvals.

This guide explains those rules in plain language, with article numbers so you can check them yourself, and adds practical guidance on planning works in rented and owned homes. It does not replace legal advice for a specific dispute, and the approvals process for each building is set by its own management and the competent authorities.

What a tenant may and may not change

Article (19) of Law No. (26) of 2007 requires the tenant to pay the rent on time and to maintain the property as an ordinary person would maintain their own property. It then sets the key rule for renovations: without prejudice to restorations that have been agreed or that are customary for tenants, the tenant may not make any changes or carry out any restoration or maintenance works to the property unless the landlord permits it and the required licences are obtained from the competent official entities.

In practice, this means two separate permissions for most works: the landlord's consent, preferably in writing, and any licence or approval the work needs from the authorities or, in a jointly owned building, from building management under its regulations. Painting a wall in a different colour, replacing a kitchen, moving a partition or changing a bathroom all fall within this rule unless the lease says otherwise.

As guidance, small customary tasks such as hanging pictures or replacing a light bulb are not usually treated as changes, but anything that alters finishes, fixtures or layout should be agreed in writing before work starts.

What the landlord must provide

Article (18) of the same law requires the landlord to provide the tenant with the approvals required to be submitted to the competent official entities whenever the tenant wishes to carry out decoration works or any other works that need such approvals, provided the works do not affect the structure of the property and the tenant has the official documents requesting those approvals.

As guidance, this means a tenant planning legitimate decoration or fit-out work should prepare the documents the authorities or building management require, and then ask the landlord for the owner's approvals and documents that go with the application. Structural works are a different matter and remain the owner's decision.

Keeping the request and the landlord's reply in writing, with drawings or a description of the works attached, avoids misunderstandings later and gives both sides a clear record if the property changes hands or the lease is renewed.

Handing the property back

Under Article (21), when the lease ends the tenant must hand the property back in the same condition in which it was received at the start of the lease, except for ordinary wear and tear or damage due to reasons beyond the tenant's control. If the parties disagree, the matter is referred to the Tribunal.

Article (23) adds that, unless otherwise agreed, the tenant may not remove any leasehold improvements made by the tenant when vacating. Article (20) allows the landlord to take a security deposit to ensure maintenance of the property at the end of the lease, and requires the deposit or its remainder to be refunded at the end of the lease.

As guidance, this combination matters for renovations. Improvements a tenant adds usually stay with the property unless agreed otherwise, while changes that leave the property in a worse condition than it was received can be claimed against the deposit. Agreeing in writing, before work starts, what happens to each improvement at move-out avoids most disputes.

Fees and taxes for works

Article (22) of Law No. (26) of 2007 provides that, unless the lease states otherwise, the tenant pays all fees and taxes due to government entities for use of the property, and any fees for a sub-lease. As guidance, permit fees and charges linked to works a tenant requests should be agreed between the parties in advance, since leases differ.

Building management may also charge refundable deposits or administrative fees for fit-out or renovation permits under its own rules. These should be confirmed before works are scheduled.

As guidance, a simple written note listing each expected fee, the amount if known, who pays it and whether it is refundable, attached to the landlord's consent or the contractor's quotation, removes uncertainty. Keeping the receipts with the works documents also makes it straightforward to reclaim refundable deposits from building management once the works are inspected and closed.

What belongs to a unit in a tower

Article (9) of Law No. (6) of 2019 lists, unless the site plan shows otherwise, what each unit in a building includes: floors and flooring materials down to the base of the joists and supporting structures; plaster ceilings and other ceilings, additions forming part of the interior, the spaces between ceilings, ceilings above support walls inside the unit, and walls separating the unit from other parts or adjacent units; the internal area, non-support internal walls and surrounding walls; windows, glass, fixtures forming part of internal windows, lighting systems, doors, door frames and all equipment and fixtures serving the unit; and bathrooms and other integral parts of the unit.

As guidance, this is why many internal works, such as new flooring, ceilings, bathroom upgrades and replacing fixtures serving the unit, fall within the owner's own unit. But owning a part does not remove the need for approvals: works must still follow the building management regulations and any licences the competent authorities require.

The site plan registered for the building can change these boundaries, so owners planning major works should check it before assuming a wall, ceiling void or window belongs to the unit.

Common parts and facades

Law No. (6) of 2019 defines common parts as including the parts outside the boundaries of units that are necessary for the existence, maintenance, sustainability, safety or operation of the jointly owned property, and Article (7) lists the building's facades among the common parts. Article (17) states that common parts may not be converted into private property, subdivided or disposed of independently without the prior approval of the Dubai Land Department and the competent authority, and that common facilities may not be altered, redesigned or shut down in a way that restricts owners' use without those approvals.

As guidance, this is why balcony enclosures, changes to external windows or glazing, external fixtures on facades, and changes that affect shared shafts, risers or corridors usually need building management's and the authorities' approval, even when the change looks small from inside the unit.

Power Zone's guide to service charges and building maintenance explains how common parts are managed and maintained in jointly owned buildings, and how owners can raise questions with building management and the owners committee.

Tenants in jointly owned buildings

Article (16) of Law No. (6) of 2019 allows an owner to lease the unit, but provides that the owner and the tenant remain obliged towards other owners and occupants, the owners committee and the management entity to comply with the jointly owned property statute, the master community declaration and the building management regulations.

As guidance, this means a tenant's renovation must satisfy three sets of rules at once: the lease and Law No. (26) of 2007, the building's own regulations, and any licensing by the competent authorities. Building management will usually ask for a contractor's details, a method statement, insurance and a work schedule before issuing a permit, and may set working hours, noise limits and protection rules for lifts and corridors.

Villas and master communities

Villas and townhouses in master communities are subject to the master community declaration. Under Article (21) of Law No. (6) of 2019, the master developer must issue a master community declaration approved by RERA before disposing of land, buildings or units, and it decides many practical matters such as how common facilities may be used and certain community rules.

As guidance, villa owners planning extensions, external changes, new pergolas, pools or major landscaping should check the community's design guidelines and approval process, as well as any licences required by the competent authorities, before contracting. Tenants of villas need the landlord's permission under Article (19) of Law No. (26) of 2007 in the same way as apartment tenants.

Power Zone's villa maintenance guide explains how planned maintenance and upgrades are handled in Dubai villas, from air-conditioning and plumbing to roofs, pools and gardens.

Planning the works step by step

As guidance, a smooth renovation in Dubai usually follows the same order: define the scope in writing with drawings or photos; confirm who owns each element affected; obtain the landlord's written consent if renting; check the building's or community's rules and permit process; obtain any licences the competent authorities require; agree the contractor, price, programme and handover standard; protect common areas; carry out the works; inspect and snag; and file every approval and certificate.

Each step protects someone: the owner's property, the tenant's deposit, neighbours' peace and the building's common parts. Skipping steps to save time is how many renovations turn into disputes.

Power Zone's fit-out guide sets out how approvals for interior works are typically handled in Dubai buildings, and what documents and inspections building management usually expects.

Documents building management usually asks for

As guidance, building management commonly asks for the unit owner's no-objection or the landlord's consent for tenants; a description and drawings of the works; the contractor's trade licence and insurance; a method statement and programme; details of any electrical, plumbing or air-conditioning changes; and arrangements for waste removal and protection of lifts and corridors. Requirements vary between buildings, so the building's own list should always be checked.

Having these documents ready shortens the approval time and reduces the risk of works being stopped halfway because a permit condition was missed or a document was out of date.

Electrical and plumbing changes

As guidance, electrical and plumbing works carry the highest safety and water damage risks in a renovation. New circuits, moved sockets, upgraded distribution boards, relocated water heaters and moved bathroom or kitchen fixtures should be designed and carried out by competent contractors, tested before finishes are closed, and documented with photos and test results.

Leaks from renovated bathrooms and kitchens can cause disputes with the unit below. Pressure testing new pipework and waterproofing wet areas properly before tiling prevent most of them. Power Zone's electrical maintenance, fixture repairs and water pressure, and waterproofing guides explain how these works are tested and recorded.

Floors, ceilings and acoustic comfort

Under Article (9) of Law No. (6) of 2019, floors and flooring materials down to the base of the joists and ceilings within the unit form part of the unit unless the site plan shows otherwise. As guidance, replacing hard flooring in an apartment can change how much impact noise reaches the unit below, so building regulations sometimes require acoustic underlays. Ceiling works can also affect shared services in the void, such as sprinklers, detectors and air-conditioning ducts.

Checking the building's rules on flooring and ceiling works, and protecting any shared services in ceiling voids, avoids problems with neighbours and building management. Power Zone's tiling and flooring and gypsum and ceiling guides explain good practice for these works.

Kitchens and bathrooms

As guidance, kitchens and bathrooms combine water, electricity, ventilation and drainage, so renovations here need the most coordination: drainage falls and connections, waterproofing, extract fans, electrical safety in wet areas and access for future maintenance. Replacing like for like is simpler than relocating fixtures, which can affect drainage and may need approvals.

Tenants should agree with the landlord before replacing kitchen units or bathroom fittings, and record what is replaced and what happens to the old items, since Article (23) generally leaves improvements in place at the end of the lease unless agreed otherwise.

Balconies, windows and external changes

Because Article (7) of Law No. (6) of 2019 lists facades among the common parts, external changes such as enclosing balconies, changing window frames or glazing, adding external shading or fixing equipment to the facade usually need building management's approval and, where relevant, licences from the competent authorities. Article (17) prohibits altering common facilities in ways that restrict owners' use without the approvals of the Dubai Land Department and the competent authority.

As guidance, owners should treat anything visible from outside the building or attached to its external walls as needing approval, and should not proceed on the basis of what neighbours appear to have done.

Protecting neighbours and common areas

As guidance, renovation works affect neighbours through noise, dust, deliveries and use of lifts. Building rules usually set permitted working hours and require protection of lifts, corridors and floors along the delivery route, and daily removal of waste. Informing immediate neighbours before noisy works start and keeping to the agreed hours reduces complaints.

Damage to common areas during works is usually charged to the unit owner or contractor responsible, so photographing the condition of corridors and lifts before works start is worthwhile.

Inspection and snagging after works

As guidance, before final payment, the completed works should be inspected against the agreed scope and quality standard: finishes, alignment and levels, doors and windows, electrical test results, plumbing pressure tests and leak checks, waterproofing records for wet areas, and cleaning. A written snag list with photos, signed by both parties, makes it clear what remains to be fixed.

Power Zone's snagging inspection guide explains how to record defects with photos and locations, and how to follow each one up until it is closed and signed off.

Records to keep

Keep the landlord's written consent if renting, building management's permit and conditions, any licences from the competent authorities, the contract and variations, test certificates and photos of works before closing walls and ceilings, the snag list and its sign-off, and warranties for materials and equipment.

As guidance, these records protect the tenant's deposit, help the owner when selling or letting the unit, and give future contractors the information they need to work safely, and they make any later warranty claim far simpler to support.

Deposits and disputes at move-out

As guidance, move-out disputes often involve renovations: a tenant who painted walls, replaced fittings or changed layouts with or without consent. Under Articles (19), (21) and (23) of Law No. (26) of 2007, works done without the landlord's permission can be claimed against, improvements generally stay with the property, and the property must be returned in the condition received, allowing for ordinary wear and tear. Disputes go to the Tribunal.

Written consent describing the works, photos of the property at move-in, and an agreement on what is to be reinstated at the end of the lease are the best protection for both sides.

Landlords renovating between tenancies

As guidance, the period between tenancies is the easiest time for an owner to renovate: there is no occupant to disturb, and works can be completed before new tenants move in. Owners should still follow the building's permit process and keep records, and should time works so that the property is handed over clean, tested and documented.

Under Article (16) of Law No. (26) of 2007, unless agreed otherwise, the landlord is responsible for maintenance and for repairing defects that affect the tenant's use, so planned upgrades between tenancies also reduce repair calls during the next lease. Power Zone's landlord and tenant maintenance guide explains the wider split of responsibilities.

Painting and decoration

As guidance, painting is a common renovation in rented homes and also a common source of move-out disputes. Tenants who want a different colour should agree it with the landlord in writing, including whether the original colour must be restored at the end of the lease. Owners repainting between tenancies should choose finishes suitable for Dubai's climate and for the room, such as washable paints in kitchens and moisture-resistant products in bathrooms.

Before painting, damp patches, cracks and mould should be investigated rather than painted over, because the cause will return. Power Zone's painting guide explains surface preparation, products and how a quality paint job is checked.

Air-conditioning changes during renovation

As guidance, moving partitions or ceilings often affects air-conditioning: supply grilles, return paths, thermostats, ductwork and condensate drains. In towers with central chilled water, fan coil units and their connections may sit on the boundary between the unit and the building's systems, so changes should be agreed with building management and carried out by competent technicians.

Renovation is also a good moment to clean ducts, service the unit's fan coils or split units and check condensate drainage, since access is easier while ceilings are open. Power Zone's AC maintenance and duct cleaning guides explain these services.

Fire safety items during works

As guidance, smoke detectors, sprinkler heads, fire alarm devices and fire-rated doors inside or serving a unit are part of the building's fire safety systems. Renovations must not cover, move or disable them without building management's approval and the involvement of the building's fire safety contractor, and dust-generating works may need temporary measures agreed with building management so that detectors are not triggered or damaged.

At the end of the works, any device that was protected or relocated should be restored and tested. Power Zone's fire safety maintenance guide explains how these systems are maintained and checked.

Partitions and layout changes

Article (9) of Law No. (6) of 2019 includes non-support internal walls within the unit, unless the site plan shows otherwise. As guidance, that does not mean any wall can be removed: some walls carry services, provide fire separation or are structural despite appearances, and layout changes can affect air-conditioning, lighting and fire safety. Building management and the competent authorities may need to approve the change, and a structural engineer should confirm any wall's role before removal.

Tenants need the landlord's permission for any layout change under Article (19) of Law No. (26) of 2007, and owners should keep the approved drawings with the unit's records. Power Zone's gypsum and ceilings guide covers partition and ceiling work.

Carpentry, wardrobes and doors

As guidance, built-in wardrobes, kitchen cabinets, shelving and doors are common renovation items. For tenants, these usually become part of the property at the end of the lease under Article (23) unless agreed otherwise, so it is worth agreeing in advance whether a fitted wardrobe will stay. Owners should choose materials suited to Dubai's humidity in bathrooms and kitchens and leave access panels for services behind cabinets.

Power Zone's carpentry guide explains how fitted joinery is measured, installed and maintained, and which materials suit kitchens, bathrooms and bedrooms in Dubai homes.

Choosing a contractor

As guidance, a contractor for renovation in a Dubai building should hold a valid trade licence for the works, carry suitable insurance, be familiar with the building's permit process, and provide a written scope, price, programme and handover standard. References from similar projects in comparable buildings, and a clear plan for protecting common areas, are good signs.

Low quotes that leave out testing, protection, waste removal or permits often end up costing more. Comparing quotes on the same written scope makes the differences visible.

Budget, payments and variations

As guidance, renovation budgets are easier to control when the scope is detailed before works start, payments are linked to completed stages rather than dates, and any change is agreed in writing with its cost before it is carried out. A contingency for hidden issues, such as damaged pipes behind walls or uneven floors under old tiles, avoids difficult decisions mid-project.

Keeping receipts and variation records also helps owners when calculating rental returns or the value of improvements when selling, and gives a clear history if a warranty claim is needed later.

Working hours, noise and timelines

As guidance, building rules usually set permitted working hours, quiet periods and days when noisy works are not allowed. Programmes should be planned within those limits from the start, especially for drilling, demolition and tile removal. Delays often come from waiting for permits, materials or inspections, so ordering long-lead items early and booking inspections in advance keep projects on track.

Agreeing a realistic programme with the occupant or landlord avoids disputes about access and disruption, and lets everyone plan around the noisiest days of the works.

Waste and dust control

As guidance, renovation waste must be removed through the route and at the times building management allows, using covered containers, and should never be left in corridors, stairwells or car parks. Dust control, such as sealing doors to other rooms, covering ventilation openings within the unit and cleaning daily, protects occupants, neighbours and the building's systems.

Final cleaning should include air-conditioning filters and grilles, which collect dust during works, and the corridors used by the contractor. Power Zone's deep cleaning guide covers post-renovation cleaning.

Buying or selling a renovated unit

As guidance, buyers of a renovated unit should ask for the renovation approvals, contractor details, test certificates and warranties, and check that external or common-part changes, such as balcony enclosures, were approved. Unapproved changes to common parts can become the new owner's problem with building management.

Sellers who kept complete records can show buyers exactly what was done and when, which supports the asking price, shortens due diligence and reduces questions from building management at transfer.

Holiday homes and short-stay refurbishments

As guidance, holiday homes and short-stay units see heavy wear, so refurbishments should favour durable, easy-to-clean finishes and fittings with locally available spare parts. Works should be timed between bookings, and the unit inspected and cleaned thoroughly before the next guest arrives.

Operators should follow the same permit and approval process as any other renovation, and keep records of works for the building and for their own maintenance planning.

Accessibility upgrades at home

As guidance, renovations for older family members or people with limited mobility often include grab rails in bathrooms, level-access showers, lever taps, better lighting, wider door openings and non-slip flooring. Many of these are inside the unit and simple to approve, but changes to bathrooms and doors still need the landlord's consent for tenants and building rules for owners.

Planning these upgrades with the person who will use them, and with an occupational therapist where possible, makes sure they help in daily life. Power Zone's fixture repairs guide covers accessible bathroom fittings and safe pipe protection under basins.

Lighting and smart home upgrades

As guidance, lighting upgrades, dimmers, smart switches, data cabling, door entry and camera systems are common additions during renovations. Article (9) of Law No. (6) of 2019 includes lighting systems and fixtures serving the unit within the unit, but connections to building systems, such as intercoms, access control or shared data risers, need building management's approval.

All new circuits and devices should be installed by competent contractors and tested, and the owner should receive a simple record of what was installed and where, including any app accounts or passwords that come with smart devices. Power Zone's lighting and CCTV guides explain these systems.

Insurance during renovation

As guidance, renovation works create risks for the unit, neighbours and common areas: water leaks, fire, damage to lifts or corridors and injuries. Owners should check their property insurance and ask the contractor for evidence of insurance covering the works and third parties, since building management usually requires it before issuing a permit.

Tenants who renovate with the landlord's consent should also check their contents insurance and agree with the landlord who is responsible if something goes wrong during the works.

Renovating after water damage or mould

As guidance, renovations that follow a leak, flood or mould problem must start by fixing the cause and drying the structure, not by covering damage with new finishes. Moisture readings, removal of damaged materials and, for mould, an approach that follows Dubai Municipality's mould remediation guidance should come before repainting or retiling.

Responsibility for the cost depends on where the water came from: inside the unit, a neighbouring unit or common parts. Power Zone's article on mould and damp in Dubai rentals and its mould remediation guide explain how responsibility and remediation work.

Energy and water efficiency upgrades

As guidance, renovation is a good time to improve efficiency: LED lighting, efficient air-conditioning equipment and controls, sealed windows and doors where approved, water-efficient taps and shower heads within the Dubai Building Code's flow rates, and insulated pipework. These upgrades reduce bills and improve comfort in Dubai's climate.

Changes that affect the facade, such as replacing windows or adding external shading, need approvals because facades are common parts. Power Zone's HVAC energy audit and fixture repairs guides explain the options.

Working with building management and the owners committee

As guidance, building management is the first contact for permits, working rules and protection of common areas. Owners who plan larger works, such as balcony changes or anything affecting shared systems, may also need to raise them through the owners committee, set up under Law No. (6) of 2019 for jointly owned buildings.

Keeping building management informed during the works, and inviting them to inspect protection and completion, builds trust, avoids last-minute objections and makes it easier to obtain approvals for future works in the same building.

When works affect the unit below

As guidance, the unit below is most exposed to renovation problems: leaks from new bathrooms or kitchens, noise from new hard flooring, and damage from drilling. Pressure testing pipework, waterproofing wet areas, using acoustic underlays where the building requires them and checking ceilings below after wet works protect neighbours.

If a leak or damage occurs, stop the source, inform the neighbour and building management immediately, document everything with photos, and arrange repairs. Fast, open communication prevents most such incidents from turning into formal disputes.

Renovation and resale or rental value

As guidance, renovations that improve kitchens, bathrooms, flooring and air-conditioning tend to make units easier to let or sell, provided they are approved, well documented and built to a good standard. Unapproved or poorly finished works can have the opposite effect, raising questions from buyers, tenants and building management.

Owners planning works for resale or rental should focus on durable, neutral finishes that suit most occupants, and keep every approval, certificate and warranty ready to share with agents, buyers and tenants.

Common renovation mistakes

As guidance, mistakes that commonly cause trouble in Dubai renovations include starting works before the landlord's written consent or the building's permit; assuming a balcony, window or external wall belongs to the unit when the law treats facades as common parts; closing walls and ceilings before testing pipework and circuits; skipping waterproofing in wet areas; and not agreeing in advance what happens to improvements at the end of a lease.

Each of these can lead to stopped works, repair costs, disputes with neighbours or a deposit dispute. A written scope, the right approvals, testing before closing finishes and clear records avoid nearly all of them.

Questions to ask before signing a renovation contract

As guidance, before signing, ask the contractor which permits and approvals they will help prepare and who submits them; how they will protect lifts, corridors and floors; how electrical and plumbing works will be tested and documented; how changes to scope and price will be agreed; what the payment stages are; how long each stage will take within the building's permitted hours; and what the handover pack will include.

Clear answers in writing are the best indicator of a contractor who will finish the job properly and leave the building management, the owner and the neighbours satisfied.

Outdoor spaces in villas

As guidance, outdoor works in villas, such as pergolas, shade structures, pools, garden lighting, irrigation and boundary walls, are often controlled by the master community's design guidelines and may need licences from the competent authorities. Owners should check the community rules and obtain approvals before ordering materials, because removal of unapproved structures can be costly.

Tenants need the landlord's written permission for any outdoor change under Article (19) of Law No. (26) of 2007, and should agree what stays at the end of the lease. Power Zone's landscaping and pool guides explain outdoor maintenance and upgrades.

Planning maintenance after the renovation

As guidance, a renovation is a natural starting point for planned maintenance: new air-conditioning equipment, water heaters, fixtures and finishes all have maintenance needs that, if met, protect the investment. Recording installation dates, models and warranty terms, and scheduling the first services, keeps the renovated home in good condition.

Power Zone's annual maintenance contract guide explains how owners and landlords can plan regular maintenance for a renovated apartment or villa, and what a useful maintenance scope includes.

Short checklist before starting

As guidance, before any renovation starts, confirm: written landlord consent if renting; the building's or community's permit and conditions; any required licences from the competent authorities; contractor licence and insurance; a written scope, price, programme and payment stages; a plan for protecting common areas and removing waste; testing of services before closing finishes; and an agreed handover standard and snag process.

Going through this checklist with the contractor and, where relevant, the landlord at the start costs little time and saves much more later, especially when building management asks questions halfway through the works.

Who pays for what in a rented home

As guidance, the split of renovation costs in a rented home depends on the lease and on why the work is needed. Under Article (16) of Law No. (26) of 2007, unless agreed otherwise, the landlord is responsible for maintenance and for repairing defects that affect the tenant's use, so repairs of worn-out or defective items generally fall on the landlord. Improvements a tenant wants for comfort or taste, such as a new colour scheme or upgraded fittings, are usually at the tenant's cost and need the landlord's consent.

Writing down who pays for each item, and whether anything will be reinstated at the end of the lease, before works start avoids many arguments later.

Renovation in newly handed-over units

As guidance, owners of newly handed-over units sometimes want to change finishes immediately. Before doing so, it is worth completing the snagging process with the developer, because defects in original works are easier to have corrected by the parties responsible for construction before they are covered by new finishes. Changes should still follow the building's permit process, which may be stricter while the developer manages the property.

Power Zone's snagging inspection guide explains how to record defects at handover so they can be fixed by the responsible parties before renovation starts and new finishes cover them.

Families with young children

As guidance, families renovating while living in the home should plan works to keep children away from tools, dust and wet areas: sealing off the work zone, removing waste daily, keeping balcony doors and windows secure, and storing materials safely. Low-emission paints and good ventilation during and after works improve indoor air for everyone.

Where possible, scheduling the noisiest and dustiest works when the family is away makes the project easier for everyone and reduces the risk of accidents.

Getting approvals right the first time

As guidance, approval delays often come from incomplete applications: missing owner consent, unclear drawings, expired contractor documents or missing insurance. Preparing a complete pack the first time, asking building management for its checklist in advance, and keeping copies of everything submitted shortens the process considerably.

When approval conditions are issued, sharing them with the contractor and site supervisor ensures they are followed on site, which avoids stoppages and fines.

Temporary living arrangements

As guidance, larger renovations, such as replacing all flooring, kitchens and bathrooms, are often faster and safer when the home is empty. Owners living in the property should consider where they will stay, how belongings will be protected or stored, and how access will be managed for the contractor while they are away.

A short written handover of keys, access cards and building management contacts to the site supervisor, with an agreed way of reporting progress with photos, keeps owners informed without daily site visits.

Renovation in older buildings

As guidance, older buildings in Dubai may have original pipework, wiring and waterproofing that are nearing the end of their life. Opening walls and floors during renovation is a good time to inspect and replace them, because doing so later means breaking new finishes. Surprises such as corroded pipes, undersized circuits or failed membranes are possible, so a contingency should be planned.

Where old materials of unknown composition must be removed, a competent specialist should identify them before demolition starts. Power Zone's electrical inspection and plumbing guides explain how older installations are assessed.

Communicating with the household and neighbours

As guidance, renovation goes more smoothly when everyone affected knows what to expect: the household, the landlord or owner, the building management and the immediate neighbours. A short notice with the start date, the noisy days, the working hours and a contact number reduces complaints and helps neighbours plan around the works.

At the end of the works, a brief message thanking neighbours and confirming completion leaves good relations in place for the future and makes the next project in the building easier for everyone.

Using the right specialists

As guidance, a renovation usually involves several trades: demolition, masonry and gypsum, carpentry, tiling, painting, electrical, plumbing and air-conditioning. Coordinating them in the right order, with tests and inspections between stages, is what separates a clean result from a series of patched repairs. A single contractor responsible for the whole sequence, or a clear coordinator when several contractors are involved, avoids gaps where nobody takes responsibility.

Specialist works such as fire safety devices, lifts or shared systems should always be left to the building's appointed contractors, with the renovation contractor working around them under building management's supervision.

Keeping the home liveable during partial works

As guidance, when only part of the home is renovated while the family stays, plan which rooms remain usable, how water and power will be maintained for the rest of the home, and how the kitchen or bathroom will be replaced temporarily if they are out of use. Phasing works so that at least one bathroom stays working makes daily life far easier.

Daily cleaning of shared routes through the home, sealed doors between the work zone and living areas, and agreed finishing times each evening keep partial renovations manageable for everyone living there, including children and older relatives.

Getting the most from a renovation budget

As guidance, the best value usually comes from fixing hidden essentials first, such as pipework, wiring, waterproofing and air-conditioning, before spending on visible finishes, because problems behind new finishes are expensive to correct. Choosing durable mid-range materials for heavily used areas and saving premium finishes for a few visible features keeps quality high without overspending.

A clear priority list agreed at the start helps decide what to cut if the budget tightens, so that essential works are never the ones dropped.

How Power Zone helps with renovations

Power Zone carries out renovation and fit-out works across Dubai with its own teams in all seven emirates, 20 in-house teams, including painting, flooring, ceilings, carpentry, electrical, plumbing, air-conditioning and waterproofing. For each project, the team prepares a written scope, supports the documentation the owner or tenant needs for building management and the competent authorities, protects common areas, tests services before finishes are closed, and hands over with a snag list and records.

To arrange a site survey or a renovation quotation, use the fit-out guide or the quotation form and mention whether the property is owned or rented.

Frequently asked questions

Can a tenant renovate a rented apartment in Dubai?

Only with the landlord's permission and after obtaining required licences from the competent official entities, under Article (19) of Law No. (26) of 2007, apart from agreed or customary restorations.

Must the landlord help with permits for decoration works?

Under Article (18), the landlord must provide the approvals required for submission to the competent entities for decoration works, as long as the works do not affect the structure and the tenant has the official request documents.

Can a tenant remove improvements when leaving?

Unless otherwise agreed, no. Article (23) of Law No. (26) of 2007 prevents the tenant from removing leasehold improvements when vacating.

What condition must the property be returned in?

The same condition as received at the start of the lease, except for ordinary wear and tear or damage beyond the tenant's control, under Article (21); disputes go to the Tribunal.

Do facades belong to the apartment owner?

No. Article (7) of Law No. (6) of 2019 lists facades among the common parts, so external changes usually need approvals.

What is included in an apartment unit under Dubai law?

Unless the site plan says otherwise, Article (9) of Law No. (6) of 2019 includes floors, ceilings, non-support internal walls, windows, doors, fixtures serving the unit and bathrooms.

Can an owner enclose a balcony in a Dubai tower?

Facades are common parts under Article (7) of Law No. (6) of 2019, so as guidance a balcony enclosure needs building management's approval and any licences from the competent authorities before work starts.

Does Power Zone carry out renovations in Dubai?

Yes. Power Zone handles painting, flooring, ceilings, carpentry, electrical, plumbing, air-conditioning and waterproofing works with its own teams, with written scopes, testing and handover records.

Reference sources

  1. Dubai Legislation Portal — Law No. (26) of 2007 Regulating the Relationship between Landlords and Tenants in the Emirate of Dubai (Articles 16 and 18 to 23)
  2. Dubai Legislation Portal — Law No. (6) of 2019 Concerning Ownership of Jointly Owned Real Property in the Emirate of Dubai (Articles 7, 9, 16, 17 and 21)