Architectural and MEP snagging inspections
Architectural and MEP snagging inspections is a Power Zone service in Lebanon and Dubai, part of renovation, fit-out & interiors. Request it online; most jobs start with a site survey and an itemised quotation.
Snagging is the inspection of a new or renovated property before you accept it, to find defects while the developer or contractor is still responsible for fixing them. Many defects are easy to miss without testing: sockets that are not earthed, RCDs that do not trip, AC units that do not reach temperature, slow drains, missing sealant, hollow tiles and leaks that only appear when water runs.
Our inspectors check both the architectural finishes and the MEP systems, electrical, AC and plumbing, and give you a written snag report with photos and locations that you can send straight to the developer or contractor. Our electrical guide includes a snagging checklist for new homes in Dubai.
What's included
- Finishes: walls, ceilings, paint, tiles, joinery, doors and windows
- Electrical: sockets, switches, lighting, board labelling and RCD tests
- AC: units, controls, drainage and temperature checks
- Plumbing: taps, drains, water pressure, hot water and visible leaks
- Wet areas and balconies: falls, sealant and waterproofing details
- A written snag report with photos and locations
When you need it
- Receiving a new apartment or villa from a developer
- Completing a renovation or fit-out
- Before the end of a defects liability period
- Buying or renting a property and wanting an independent check
- Repeated faults in a property that is still under warranty
What affects the price
- Property size and type
- Depth of the inspection: visual only or with system tests
- Number of visits, including re-inspection after repairs
- Report format required by the developer or contractor
Published starting prices are available for selected services in the Dubai rate card (AED) and Lebanon rate card (USD). These are not fixed final quotations: the service scope, required parts and site conditions determine the itemised quotation after assessment. Request a Dubai quotation or request a Lebanon quotation.
Questions
When should snagging be done?
Before you accept handover, or as soon as possible afterwards, and again before the defects liability period ends. Reporting defects in writing during that period is what gets them fixed at the developer's cost.
Can you re-inspect after the developer fixes the snags?
Yes. A re-inspection confirms that the items were actually fixed and closes the list.
Do you test the systems or only look at finishes?
Both. Electrical, AC and plumbing are tested, not just looked at, because many system defects can't be seen.
How the job runs
- RequestChoose the service, add photos and tell us how urgent it is.
- Site surveyAn engineer visits, measures, photographs and records any risks.
- Itemised quotationEvery line priced, tax shown separately, warranty terms included.
- The workProgress photos as we go. Any change is approved by you first.
- HandoverSnag check, warranty certificate and the final invoice.

Related services
- Interior design and space planning
- Complete interior fit-out
- Building renovation and restoration
- Façade restoration
- Gypsum partitions and ceiling works
- Interior and exterior painting and wall finishes
- Tiling and grouting
- Wooden flooring and carpet installation and repairs
- Carpentry and custom joinery
- Furniture refurbishment and upholstery installation
- Glass and aluminium works
- Steel fabrication and installation
- Signage and branding installation
- Furniture and furnishings supply and installation