61 SERVICES
POWER ZONE عربي Request a site visit
ServicesAboutLebanonDubai
Get a quotationDubai prices AEDLebanon prices USD
How we workFAQTrust & SecurityContactPrivacy policyTerms of use
Home / Dubai / Annual maintenance contracts in Dubai: the complete guide

Annual maintenance contract company in Dubai: the complete AMC guide

Power Zone provides annual maintenance contracts in Dubai for homes, offices and buildings. Scope, scheduled visits, parts coverage and response terms should be defined in the written contract.

What to send for an annual maintenance contract quote in Dubai

Share the building type, number of AC units, principal electrical and plumbing systems, recent maintenance records, site-access requirements and any recurring faults. Ask for a written schedule of planned visits, included systems, exclusions, parts coverage and emergency call-out terms. The proposed AMC scope and price should follow a site assessment rather than an assumed one-size-fits-all package.

Request an AMC assessment · Review Dubai service pricing

Power Zone is an annual maintenance contract (AMC) company in Dubai: one in-house team covers every building system for homes, offices and buildings under a 12-month contract, with itemised pricing and a free site assessment.

An annual maintenance contract (AMC) in Dubai is a 12-month agreement combining planned preventive maintenance with reactive repairs for defined building systems. The key choices are scope (which assets), parts policy (comprehensive, semi-comprehensive or non-comprehensive) and response times. Regulated systems set minimums: grease traps at least twice a month under Dubai Municipality rules, and fire protection maintenance under Dubai Civil Defence requirements. In jointly owned buildings, common parts are maintained through RERA-approved service charges.

2026-10-31Last updated6Verified sources22Questions answered30Sections

What an annual maintenance contract actually is

An annual maintenance contract, usually shortened to AMC, is an agreement in which a maintenance company takes responsibility for keeping a defined set of building systems working for a fixed term, normally twelve months, in return for an agreed fee. A good AMC combines two kinds of work:

  • Planned preventive maintenance (PPM): scheduled visits to inspect, clean, test and service equipment before it fails. In Dubai that means things like cleaning AC filters and coils, checking electrical panels, testing pumps, and cleaning grease traps on the required schedule.
  • Reactive or corrective maintenance: responding when something breaks, leaks, trips or stops, within response times that the contract defines.

The value of an AMC is not the visits themselves. It is that one accountable company knows your building, keeps a record of every asset, plans the work that prevents breakdowns, and answers the phone when something fails at the worst possible moment.

Why AMCs matter more in Dubai than almost anywhere else

  • Air conditioning is not optional. In Dubai's climate, an AC failure in summer is not a comfort issue, it is a business or household emergency. Systems that run almost continuously wear faster and need regular servicing.
  • Towers and shared systems. Many residents and businesses sit inside jointly owned buildings where pumps, chillers, lifts, fire systems and drainage are shared. One neglected system affects everyone.
  • Regulated systems. Some systems carry specific regulatory requirements. Grease traps must be cleaned at least twice a month under Dubai Municipality's guideline. Fire protection maintenance falls under Dubai Civil Defence requirements.
  • Dust, humidity and salt air. Sand and dust load AC filters and coils, humidity encourages mould in ducts and drain pans, and coastal air accelerates corrosion on outdoor equipment.

Who is responsible for maintenance in a Dubai building

Before you sign any AMC, be clear about which parts of the property are yours to maintain.

Jointly owned buildings and communities

Dubai Law No. 6 of 2019 concerning ownership of jointly owned real property defines common parts as the parts of the property designated for common use by owners and occupants, and service charges as the annual charges collected from owners to cover the cost of management, operation, maintenance and repair of the jointly owned property. The Real Estate Regulatory Agency (RERA) sits at the centre of oversight: service charges must be approved by RERA, and legal commentary on Article 27 of the law notes that RERA's prior written consent is required for fees relating to the management, operation, maintenance and repair of common parts.

In practice, common systems such as central plant, lifts, building fire systems, common-area lighting and shared drainage are maintained through the owners association and the management company, funded by service charges. If you own or rent a unit in such a building, your own AMC normally covers what sits inside your unit or is designated for your exclusive use.

Villas and standalone buildings

For a villa or a building with a single owner, the owner carries responsibility for all systems. This is where a comprehensive AMC is most valuable, because there is no owners association behind you.

Tenants

For rented property, the split between landlord and tenant maintenance is typically set by the tenancy contract. Read it before you sign an AMC, so you do not pay to maintain something the landlord is responsible for, or leave a gap that nobody covers.

Comprehensive, semi-comprehensive or non-comprehensive?

The most important commercial decision in an AMC is how spare parts are handled. The terms vary between companies, so always check the definitions in the contract itself.

Non-comprehensive (labour only)

The fee covers scheduled visits and labour for reactive call-outs. Parts and materials are quoted and charged separately when needed.

  • Suits: newer properties with equipment still under manufacturer warranty, or owners who want the lowest fixed cost.
  • Watch for: unclear approval rules for parts. The contract should say that parts above an agreed value need your written approval before purchase.

Semi-comprehensive

Labour and defined consumables are included, such as filters, belts, fuses or cleaning chemicals, while major components are charged separately.

  • Suits: most homes and small businesses that want predictable costs without paying for the risk of major failures.
  • Watch for: a clear list of what counts as a consumable and what counts as a major part.

Comprehensive

Labour and parts are included within defined limits, so the maintenance company carries more of the risk of failures.

  • Suits: owners who want a fixed annual cost and minimal involvement.
  • Watch for: exclusions. Comprehensive contracts commonly exclude major items such as compressors, replacement of complete units, damage caused by misuse, and pre-existing defects. Read the exclusion list as carefully as the inclusion list.

No AMC: call-out only

Paying per call-out can look cheaper, and for a small apartment with simple systems it may be. The trade-off is that no one is doing preventive maintenance, you have no agreed response time, and every visit starts from zero knowledge of your property.

What systems an AMC can cover

A building AMC can be as narrow as a single AC system or as broad as every system in the property. Power Zone structures contracts around nine building systems:

SystemTypical AMC scope
Air conditioning, heating and ventilationAC servicing and coil cleaning, filter replacement, drain line checks, duct inspection and cleaning, fault response
Electrical, generators and solarPanel and circuit checks, safety devices, lighting, generator servicing, solar panel cleaning
Plumbing and water systemsLeak checks, pumps, water heaters, water tank cleaning, drains, filtration
Building, safety and technologyFirefighting system maintenance, lifts, escalators, CCTV, access control, networks
Commercial kitchen systemsGrease traps, hood and exhaust duct cleaning, ecology units, kitchen filters
Cleaning and pest controlScheduled cleaning, deep cleaning, pest and rodent control programmes
Pools and wellnessPool cleaning, water balancing, equipment, saunas and ice baths
Property upkeep and outdoorHandyman work, waterproofing, landscaping and garden maintenance
Renovation, fit-out and interiorsPainting, carpentry, tiling, ceilings and repairs that arise during the year

You do not need every system in one contract. Many clients start with the systems that cause the most disruption when they fail, usually air conditioning, plumbing and electrical, and add others later.

How often should each system be serviced?

How often should you schedule property maintenance in Dubai? There is no single Dubai-wide interval. Schedule each system on its own clock: regulated systems on their legal minimums (grease traps in food establishments at least twice a month under Dubai Municipality guidance; fire protection under Dubai Civil Defence requirements, which the public-sector AMCs we reviewed set at quarterly preventive maintenance), all other equipment on the manufacturer's schedule adjusted to the property, and seasonal work timed to Dubai's climate: full AC servicing before summer, and roof, terrace and drain checks before the winter rains. An AMC turns these intervals into one planned calendar for the whole property.

A PPM schedule should be built from three sources, in this order: regulatory requirements, the manufacturer's instructions for each piece of equipment, and the conditions of the specific property. Where a rule or recognised standard exists, it sets the floor:

SystemMinimum reference and source
Grease traps in food establishmentsCleaned at least twice a month, more in busy periods (source: Dubai Municipality grease trap guideline)
Kitchen exhaust systemsInspection monthly to annually, by cooking type and volume (source: NFPA 96)
Fire protection systemsMaintained under Dubai Civil Defence requirements; public-sector AMCs we reviewed specify quarterly preventive maintenance (source: Dubai Civil Defence; DEWA tender specifications)
All other equipmentManufacturer's maintenance schedule, adjusted to site conditions (source: manufacturer documentation)

Our detailed guides cover the systems where the rules are most specific: the kitchen exhaust and grease trap compliance guide, the Arabic AC maintenance guide for Dubai and the Arabic pest control guide for Dubai.

What Dubai's own public buyers ask for in an AMC

One of the best ways to understand what a serious AMC looks like is to read how large public organisations specify one. Requests for quotation published by the Dubai Electricity and Water Authority (DEWA) for the annual maintenance of fire alarm, firefighting and emergency lighting systems at its sites include requirements such as:

  • approval from Dubai Civil Defence for the maintenance of fire protection systems;
  • preventive maintenance carried out quarterly, with a minimum number of services in the year;
  • emergency maintenance calls attended 24 hours a day, 7 days a week;
  • the maintenance contract agreement and safety certificate obtained from Dubai Civil Defence;
  • both preventive activities and corrective maintenance within scope;
  • a snag list submitted once the contract is awarded;
  • an ISO-certified service provider.

You do not need to run a tender like DEWA to benefit from this. The principles transfer to any building: defined preventive frequency, defined emergency response, regulatory paperwork handled by the contractor, a baseline condition survey at the start, and both preventive and corrective work in scope.

The AMC checklist: what the contract must say

  1. Asset register: a list of every piece of equipment covered, with location, make, model and capacity where possible. If it is not on the list, assume it is not covered.
  2. Scope per asset: what will be done to each asset on each visit, not just "general maintenance".
  3. PPM schedule: how many visits per year, for which systems, and in which months.
  4. Response times: definitions of emergency, urgent and routine faults, and the maximum response time for each. A response time without a definition of "emergency" is meaningless.
  5. Working hours and out-of-hours cover: whether nights, weekends and public holidays are included, and at what cost if not.
  6. Parts policy: comprehensive, semi-comprehensive or non-comprehensive, with a list of included consumables and an approval threshold for chargeable parts.
  7. Exclusions: a clear list, including how pre-existing defects found in the first survey are handled.
  8. Reporting: a written report after every visit, with findings, work done, photos where relevant, and recommendations.
  9. Regulatory documents: who obtains and maintains the certificates and records that regulators may ask for.
  10. Licensing and insurance: the contractor's trade licence and insurance cover.
  11. Subcontracting: whether any work will be subcontracted, and to whom.
  12. Health and safety: how the contractor manages work at height, electrical isolation, confined spaces and chemicals on your premises.
  13. Payment terms: annual, quarterly or monthly, and what happens to unused visits.
  14. Term, renewal and termination: notice periods and conditions for ending the contract early.
  15. Warranty on repairs: the written duration, coverage and exclusions of the repair warranty.

What a preventive maintenance visit looks like

"Preventive maintenance" is only useful if it means specific work. These are examples of what a visit should include for common systems. The exact tasks depend on the equipment and the manufacturer's instructions.

Air conditioning

  • Clean or replace filters, and record their condition.
  • Inspect and clean evaporator and condenser coils as needed.
  • Check and flush condensate drain lines and drain pans, a common source of leaks and odours.
  • Check fan motors, belts where fitted, and electrical connections.
  • Measure supply air temperatures and note any loss of performance.
  • Check thermostats and controls.

Electrical

  • Visually inspect distribution boards for heat damage, loose connections and labelling.
  • Test residual current devices where applicable.
  • Check lighting, emergency lighting and external lighting.
  • Record any overloaded circuits or recurring trips.

Plumbing and water

  • Check visible pipework, valves and fixtures for leaks.
  • Check pumps for noise, vibration, pressure and leaks.
  • Service water heaters according to manufacturer guidance.
  • Check drains and floor traps; clear slow drains before they block.
  • Schedule water tank cleaning and filter changes.

Pools

  • Test and balance water chemistry.
  • Clean skimmers, strainers and filters.
  • Check pumps, heaters and dosing equipment.

Each visit should end with a report: what was checked, what was found, what was done, and what needs attention next.

What drives the price of an AMC

We do not publish fixed AMC prices, because two properties of the same size can need very different contracts. These are the factors that actually move the price:

  • Number and type of assets: ten split AC units cost less to maintain than a central system with air handling units and ductwork.
  • Age and condition: older equipment needs more attention and fails more often.
  • Number of PPM visits: monthly, quarterly or semi-annual schedules change the labour content significantly.
  • Parts policy: comprehensive contracts cost more because the contractor carries the risk of failures.
  • Response commitments: 24/7 emergency cover with short response times costs more than business-hours cover.
  • Access: work at height, rope access, confined spaces or restricted building access add time and equipment.
  • Regulated systems: systems with specific regulatory requirements carry documentation and compliance work.

The right question is not "what is the cheapest AMC" but "what will this property cost to maintain properly over the year, and which contract shows that most clearly".

AMCs, warranties and new buildings

New properties and new equipment often come with manufacturer warranties, and new developments may carry defect obligations after completion. An AMC should work alongside these, not against them:

  • Keep warranty documents with the asset register, so the contractor knows which items are under warranty.
  • Warranty repairs should go to the manufacturer or installer, while the AMC handles routine maintenance.
  • Many manufacturer warranties expect regular servicing. Visit reports from your AMC become the evidence that the equipment was maintained.
  • Defects found in the first survey of a new property should be reported to the party responsible for them, not quietly absorbed into the AMC.

For new handovers, a snagging inspection before the AMC starts separates construction defects from maintenance issues.

Working inside managed buildings

In towers and managed communities, maintenance work inside a unit often depends on the building management: access for technicians, work permits for certain tasks, rules for working hours, and coordination when a fault in your unit is linked to a shared system. A good AMC contractor handles this coordination on your behalf, knows when a problem belongs to the building rather than the unit, and documents it so that the right party fixes it.

Measuring whether your AMC is working

An AMC is a service, and services can be measured. Ask for these indicators in the annual review:

  • PPM completion: the percentage of scheduled visits actually completed on time.
  • Response compliance: the percentage of faults answered within the agreed response time, by category.
  • Repeat faults: the same fault recurring on the same asset is a sign that the root cause was not fixed.
  • Report turnaround: how quickly visit reports are delivered after each visit.
  • Open recommendations: issues raised in reports that are still waiting for a decision.

Reviewing these numbers once a year turns renewal from a formality into a real decision.

Building technology in an AMC

Modern buildings depend on systems that rarely appeared in maintenance contracts a generation ago. If your property has them, decide explicitly whether they belong in the AMC:

  • Lifts and escalators: these need specialist technicians, scheduled servicing and fast response when a lift stops with people inside. Make sure the contract says who responds to entrapments and how quickly.
  • CCTV and access control: cameras, recorders, door controllers and gate automation fail quietly. Preventive checks confirm that recording works and that access points open and lock as intended.
  • IT networks: in offices, cabling, switches and wireless coverage affect every employee. Include them if the contractor has the skills; otherwise make sure responsibility is clearly assigned elsewhere.
  • Home automation: smart lighting, blinds and climate controls in villas need firmware, sensors and controllers kept working.
  • Generators and solar: generators need regular running and servicing to be ready when needed; solar panels in Dubai's dust lose output when they are not cleaned.

The common thread is clarity. Every system in the building should have a named party responsible for it, whether that is your AMC contractor, a specialist, the manufacturer or the building management. Gaps appear where everyone assumes someone else is looking after it.

Outdoor areas, pools and gardens

For villas, compounds and hospitality properties, outdoor systems are a large share of the maintenance load: irrigation and landscaping, pool water chemistry and equipment, outdoor lighting, terraces and roof waterproofing, and pest control around gardens. These systems are seasonal and visible. A pool that turns green or a garden that dries out during a heatwave is noticed immediately by residents and guests. Including them in the same AMC as the building systems means one schedule, one team and one report, instead of separate contractors arriving on different days with no shared view of the property.

Red flags when comparing AMC proposals

  • No site survey before the price. A company that quotes an annual contract without seeing the property is guessing, and the guess usually shows up later as exclusions or extra charges.
  • "Unlimited call-outs" with no response time. Unlimited visits mean nothing if the contract does not commit to when someone will arrive.
  • Vague scope. "General maintenance of AC units" tells you nothing. Ask what will be done to each unit on each visit.
  • No asset register. Without a list, any disputed item becomes "not covered".
  • No reports. If there is no written record of each visit, you have no way to know whether the work was done.
  • Pressure to sign immediately. A serious contractor gives you time to compare.
  • Prices far below the market. Very low AMC prices are often recovered through chargeable parts, exclusions, or visits that never happen.

How to compare quotes like for like

AMC quotes are notoriously hard to compare because each company structures them differently. Put every proposal into the same frame:

QuestionProposal AProposal B
Systems and assets covered
PPM visits per year, per system
Emergency response time and definition
Out-of-hours and holiday cover
Parts policy and consumables included
Main exclusions
Reporting after each visit
Regulatory paperwork handled
Warranty on repairs
Annual price and payment terms

Once the proposals sit side by side, the cheapest one is often not the one that costs least over the year.

AMCs by type of property

Apartments

Focus on what sits inside the unit: split or ducted AC units and their drain lines, the water heater, plumbing fixtures, electrical points and the distribution board. Central systems are usually the owners association's responsibility, so check before you pay twice.

Villas and townhouses

The widest scope: AC systems, pumps, water tanks, water heaters, electrical, outdoor lighting, gardens and irrigation, pools, waterproofing on roofs and terraces, and pest control. Villas benefit most from a single contract covering everything, because otherwise the owner coordinates many separate companies.

Offices

Downtime costs money, so response times and working-hours coverage matter more than in homes. Typical scope: AC, lighting, electrical, plumbing in pantries and washrooms, IT network cabling, access control, cleaning, and small fit-out repairs.

Restaurants, cafés and cloud kitchens

Kitchen systems drive the contract: grease traps on Dubai Municipality's twice-monthly minimum, hood and duct cleaning by inspection under NFPA 96, kitchen filters, drainage and pest control, plus AC that copes with kitchen heat.

Retail

Lighting, AC and signage carry most of the customer experience, and repairs often have to happen outside opening hours. In malls, the scope must fit the landlord's own maintenance and access rules.

Warehouses and light industrial

Electrical systems, generators, roller shutters, lighting at height, pest and rodent control, and roof waterproofing usually dominate.

Owners associations and management companies

Common-area contracts sit within the jointly owned property framework, with service-charge budgets overseen by RERA. Clear scopes, asset registers and visit reports make budget reviews and owner questions far easier to answer.

The first 90 days of a new AMC

  1. Site survey and asset register: every asset recorded, with photos and condition notes.
  2. Baseline condition report: what is working, what is worn, and what is already defective. This protects both sides, because pre-existing defects are identified before the contract starts carrying them.
  3. Snag list and priorities: urgent issues fixed first, with quotations for anything outside the contract scope.
  4. PPM calendar: visits scheduled for the year, agreed with you around occupancy and business hours.
  5. Contact and escalation: who to call for emergencies, and who to escalate to if a response is late.
  6. First reports: after the first round of visits, you should already be able to see the state of every system on paper.

Records that make an AMC worth having

At the end of each year, a well-run AMC leaves you with a complete history: the asset register, every visit report, every fault and how quickly it was answered, every part replaced, and recommendations for the coming year. That history is useful when you renew the contract, when you sell or lease the property, when an owners association reviews its budget, and when a regulator or insurer asks for evidence of maintenance.

Seasonal planning in Dubai

  • Before summer: full AC servicing, coil and filter cleaning, drain line checks, and electrical checks on circuits that will carry peak load.
  • During summer: faster response expectations for AC faults; more frequent filter checks where dust is heavy.
  • Before the rainy days of winter: roof and terrace waterproofing checks, drains and gutters cleared.
  • All year: regulated systems on their required schedules, such as grease traps in food businesses.

Common misunderstandings about AMCs

"An AMC means everything is free"

Only what the contract includes is covered. Parts, exclusions and work outside the scope are usually chargeable. Read the scope and exclusions before assuming.

"More visits always means better maintenance"

Visits without defined tasks and reports can be a quick look and a signature. Four well-documented visits are worth more than twelve undocumented ones.

"The AMC covers the whole building"

In jointly owned buildings, common systems are usually the owners association's responsibility. A unit AMC covers the unit, not the central chiller or the building's fire pumps.

"If nothing breaks, the AMC was a waste"

When preventive maintenance works, nothing dramatic happens. The value shows in fewer breakdowns, longer equipment life and the absence of emergency call-out bills.

Switching AMC contractors

If your current contract is not delivering, changing contractors is straightforward when it is planned:

  1. Check the notice period and termination terms in your current contract.
  2. Collect your records: asset register, visit reports, warranties and any regulatory documents held by the outgoing contractor.
  3. Have the new contractor survey the property before the old contract ends, so there is no gap in cover.
  4. Agree a baseline condition report with the new contractor, so existing issues are recorded at the start.
  5. Make sure regulated systems never fall out of their required schedules during the changeover.

A sample annual plan for a restaurant

As an illustration only, this is how the regulated and practical requirements might come together for a typical Dubai restaurant. The actual plan depends on the kitchen, the equipment and the inspection results.

  • Twice a month or more: grease trap cleaning by an authorised company, under Dubai Municipality's minimum, with disposal records kept.
  • By inspection under NFPA 96: kitchen exhaust inspection at the frequency that fits the cooking volume, with cleaning when grease builds up.
  • Regularly: kitchen filter checks and replacement, and a pest control programme with written records.
  • Before summer: AC servicing for dining areas and kitchen cooling.
  • Throughout the year: plumbing and drainage checks, electrical checks on kitchen circuits, and reactive response for breakdowns during service.

Five questions to ask before you sign

  1. Which of my assets are not covered, and why? The answer tells you more about the contract than the list of what is covered.
  2. What exactly happens when I report an emergency at night? Ask who answers, how a technician is dispatched, and what counts as an emergency.
  3. Who decides when a part is replaced, and how am I asked to approve it? Clear approval rules prevent surprise invoices.
  4. What will I receive after each visit? Ask to see a sample report before you sign.
  5. What happens to defects found in the first survey? They should be listed, quoted separately and agreed, not silently excluded later.

A contractor who answers these questions clearly and in writing is usually one who will deliver the contract the same way.

Common parts or unit? Where a building contract ends and an owner's begins

In a jointly owned building, the first question for any maintenance contract is what belongs to whom. Law No. (6) of 2019 concerning Ownership of Jointly Owned Real Property in the Emirate of Dubai answers it. Article 7 lists Common Parts, without limitation, including the structural components such as supports, foundations, columns, structural walls, ceilings, staircases, facades and roofs; and, unless the site plan says otherwise, halls, parking aisles, entrances, emergency exits, windows in external walls, recreational facilities, swimming pools, gardens and car parks used by the management. Article 9 lists what a Unit includes, unless the site plan says otherwise, such as its floors and flooring down to the base of the joists, its ceilings, and the walls separating it from other units or common parts.

The practical result for contracts: a building's AMC, managed by the Management Entity, covers common parts and shared systems; an owner's or tenant's AMC covers what sits inside the unit. A good contract names the boundary explicitly, for example where a riser ends and a unit's plumbing begins, so nothing falls between the two.

Service charges, RERA approval and how the money must be handled

Law No. 6 of 2019 sets strict rules for the money that pays for common-part maintenance:

ArticleWhat it says (summary of the official text)
Article 25Each owner pays the Management Entity a share of the annual Service Charges covering management, operation, maintenance and repair of Common Parts, based on the ratio of the unit's area to the total area
Article 27No amount may be charged to owners for management, operation, maintenance or repair without RERA's prior approval, and RERA may not approve a budget unless it is approved by a certified audit firm recognised by RERA
Article 28An owner may not refuse to pay RERA-approved charges, or waive his interest in Common Parts to avoid them
Article 29The developer or Management Entity may not stop an owner using his unit or common parts to force payment outside the law's procedures
Article 30Service Charges go into a dedicated account with a licensed bank recognised by RERA, deposited within seven working days of collection, and protected from the Management Entity's creditors
Article 32The Management Entity has a lien on every unit for unpaid charges; after a 30-day written notice approved by RERA, the claim can be enforced through the Rental Disputes Settlement Centre

For maintenance companies bidding on common-part contracts, this means the contract value sits inside an audited, RERA-approved budget. Proposals that are clearly itemised by asset and frequency are easier for a Management Entity to defend in that budget, which is one reason Power Zone prices common-part AMCs line by line.

What the law expects from the Management Entity and the Owners Committee

The law gives the Management Entity explicit maintenance duties, and gives owners a committee to check them:

  • Contracts: under Article 34, the Management Entity concludes contracts with maintenance, security, cleaning, insurance and other companies as needed to perform its duties, and gives RERA a periodic report every six months on management and the maintenance works performed.
  • Inspection and notices: Article 33 gives RERA authority to inspect and audit the management, operation, maintenance and repair of jointly owned property and to record violations; under Article 35, where common parts are not maintained in good, clean and serviceable condition, RERA may serve a written notice stating the required works with start and completion dates.
  • Security: Article 36 of Dubai Law No. 6 of 2019 addresses financial security for damage to common parts or facilities caused by a Management Entity’s omission or negligence. This is a statutory management obligation, separate from an AMC contractor’s repair warranty. Consult the official Article 36 text for the required financial instrument and procedure.
  • Insurance: Article 41 requires the property to be insured for maintenance and reconstruction in case of fire, damage or destruction, and against liability for damage and bodily injury to occupants or third parties.
  • Owners Committee: under Article 24, it verifies that the Management Entity carries out management, operation, maintenance and repair in line with the law and the Building Management Regulation, reviews annual maintenance budgets, discusses maintenance problems, and notifies the Management Entity or RERA of structural defects or common-part damage needing urgent repair.

The six-monthly report to RERA is the strongest argument for a documented AMC: a contractor that reports every visit with dates, photos and closed defects gives the Management Entity the material for that report, and gives the Owners Committee something concrete to check.

Defect liability, alterations and where an AMC starts

Two more provisions shape maintenance planning in newer Dubai buildings. Article 40 keeps a developer liable for ten years from the completion certificate to remedy defects in the structural parts, and for one year from handover of a unit to repair or replace defective installations, including mechanical and electrical works. Article 39 allows substantial alterations to the structure or external appearance of a unit, or to any part of the property, only with the approval of the Master Developer, the Dubai Land Department and the Competent Authority, and makes the occupant liable for remedying damage from unapproved changes.

For owners and managers, this means the first year of a new building's AMC should run alongside the developer's defect liability: the maintenance contractor documents defects in installations so they can be claimed under Article 40 rather than paid for from service charges. And any fit-out or modification that touches structure or facades waits for the approvals Article 39 requires. Power Zone's snagging inspections and AMC reporting are built to support both. See MEP snagging inspections.

Annual maintenance contracts with Power Zone

Power Zone is a building services company with its head office in Business Bay, Dubai, operating across Dubai and the UAE. Because we work across nine building systems, one contract can cover what would otherwise take several separate companies, with one point of contact and one set of records.

How we build an AMC:

  1. Request: tell us the property type, size and the systems you want covered.
  2. Site survey: our team visits, builds the asset register and records the condition of each system.
  3. Itemised proposal: scope per system, PPM visits, response commitments, parts policy and exclusions, written so you can compare it with any other proposal.
  4. Approval: nothing starts until you approve the proposal.
  5. Delivery: scheduled visits, reactive response, and a written report after every visit.
  6. Handover and warranty: repair work is handed over with a warranty certificate.

See how we work, Power Zone in Dubai, or request a site survey.

More Dubai guides

All guides

Frequently asked questions

What is an annual maintenance contract in Dubai?

A 12-month agreement in which a maintenance company keeps a defined set of building systems working, combining planned preventive maintenance visits with reactive repairs, for an agreed fee.

How often should I schedule property maintenance in Dubai?

There is no single Dubai-wide interval. Schedule each system on its own clock: regulated systems on their legal minimums (grease traps in food establishments at least twice a month under Dubai Municipality guidance; fire protection under Dubai Civil Defence requirements, which the public-sector AMCs we reviewed set at quarterly preventive maintenance), all other equipment on the manufacturer's schedule adjusted to the property, and seasonal work timed to Dubai's climate: full AC servicing before summer, and roof, terrace and drain checks before the winter rains.

What is the difference between a comprehensive and a non-comprehensive AMC?

A non-comprehensive AMC covers labour and scheduled visits, with parts charged separately. A comprehensive AMC includes parts within defined limits, so the contractor carries more of the risk. Semi-comprehensive contracts include consumables but charge for major parts. Definitions vary, so check the contract wording.

Do I need an AMC for an apartment in Dubai?

It depends on what you are responsible for. In jointly owned buildings, common parts are maintained through the owners association and service charges. An apartment AMC normally covers what sits inside your unit, such as AC units, the water heater, plumbing fixtures and electrical points.

Who maintains the common areas of a Dubai building?

Under Dubai Law No. 6 of 2019, service charges collected from owners cover the management, operation, maintenance and repair of jointly owned property, and service charges must be approved by RERA. Common areas are maintained through the owners association and its management company.

Is a fire system maintenance contract required in Dubai?

Fire protection maintenance falls under Dubai Civil Defence requirements. Public-sector AMC specifications in Dubai, such as DEWA's, require Civil Defence approval for fire protection maintenance and a maintenance contract agreement and safety certificate from Dubai Civil Defence.

How many visits should an AMC include?

It depends on the systems and the property. Regulated systems set minimums, such as grease trap cleaning at least twice a month for food businesses. For other equipment, the schedule should follow the manufacturer's instructions adjusted to site conditions.

What response terms should an AMC specify?

The contract should define what counts as an emergency, urgent and routine fault, and set a maximum response time for each. A response time without a definition of emergency is not enforceable in practice.

What should be excluded from an AMC?

Common exclusions include major components such as compressors, complete unit replacements, damage from misuse, and pre-existing defects. The exclusion list should be explicit and reviewed before signing.

Why do I need an asset register in my AMC?

The asset register lists every piece of equipment covered. Without it, disputed items can be treated as not covered. It also becomes the basis for planning, reporting and renewal.

Should the contractor survey the property before quoting?

Yes. A site survey is the only way to price an AMC accurately and to identify pre-existing defects before the contract starts. Quotes without a survey tend to recover the difference through exclusions and extra charges.

Can one AMC cover several building systems?

Yes. Power Zone structures AMCs across nine building systems, from air conditioning and electrical to plumbing, kitchen systems, cleaning and pest control, pools, outdoor upkeep and interior repairs, so one contract can replace several.

What reports should I receive under an AMC?

A written report after every visit, covering findings, work done, parts used, photos where relevant and recommendations, plus an annual summary of faults, response times and planned work for the next year.

Is an AMC worth it for a villa?

Villas usually benefit most, because the owner is responsible for every system and there is no owners association behind them. One contract avoids coordinating many separate companies and keeps a single maintenance history.

When is the best time to start an AMC in Dubai?

Before summer is ideal, so the first preventive round covers AC servicing before peak load. But an AMC can start at any time, beginning with a site survey and a baseline condition report.

Does Power Zone offer AMCs across Dubai?

Yes. Power Zone provides annual maintenance contracts for homes, offices, restaurants, retail and buildings across Dubai and the UAE, from its head office in Business Bay.

How do I get an AMC proposal from Power Zone?

Send a request through the contact page or WhatsApp with the property type and the systems you want covered. We arrange a site survey, then send an itemised proposal for your approval before anything starts.

What are Common Parts under Dubai law?

Article 7 of Law No. 6 of 2019 lists structural components, roofs, facades and staircases, and unless the site plan says otherwise, halls, entrances, emergency exits, external windows, pools, gardens and management car parks.

Can a management company charge owners without RERA approval?

No. Article 27 of Law No. 6 of 2019 prohibits charging owners for maintenance without RERA's prior approval, and budgets must be approved by a certified audit firm recognised by RERA.

How often must a Management Entity report maintenance to RERA?

Every six months, under Article 34 of Law No. 6 of 2019, covering management and the maintenance works performed.

How long is a Dubai developer liable for defects?

Ten years from the completion certificate for structural defects, and one year from unit handover for defective installations including mechanical and electrical works, under Article 40.

Can an owner alter the facade or structure of a unit in Dubai?

Only with the approval of the Master Developer, the Dubai Land Department and the Competent Authority under Article 39, and the occupant must remedy damage from unapproved alterations.

Sources

Plan your Annual maintenance contract Dubai service

Compare contract scope, scheduled inspections, exclusions, response procedures and written service reporting.

Power Zone can review your service request and provide a quotation based on the actual site and required work.

Related Power Zone services

Request a service quotation from Power Zone — include your location, service and preferred contact method.

Prepare an AMC brief that contractors can price consistently

  1. List the property type, occupied hours, assets and existing service records. Separate equipment inside each unit from shared building systems so that responsibilities are clear.

  2. Ask each bidder to price the same asset list, visit schedule and operating hours. Record labour, consumables, replacement parts, access equipment and specialist subcontracting separately.

  3. Define response and restoration separately: attending a fault does not mean that a replacement component is available. Ask how urgent faults are triaged, who approves extra work and how visits are documented.

  4. At handover, request an asset register, the next planned visit dates, open defects and a contact route. Compare subsequent reports with that baseline before renewing.

Related service scopes

Request an assessment and quotation

Chat with us on WhatsApp
WhatsAppRequest a visit